Runway renovation work
Initial runway renovation work may cause operational constraints. Luxair is prepared to minimise repercussions on its passengers.
Initial preparation work for the renovation of Luxembourg Airport’s landing strip started mid-May 2018. These works will be carried out during the night, in several phases of a few weeks each, until mid-September. Luxembourg airport will not be operational during the works.
Delayed in-coming flights (the delays may have multiple causes, such as congested departure airports, slot issues due to intense traffic, adverse weather conditions, strike, etc ) will thus receive no authorisation to land outside the set times for works and will be diverted to nearby airport..
Luxair has already implemented a series of measures to minimise any inconvenience for its passengers. In case of a deviated flight, the passengers will be taken care of and carried as quickly as possible back to Luxembourg Airport by bus.
Luxair is prepared to handle these exceptional situations and takes care of each of its customers. Luxair will do its utmost to minimise any inconvenience for its passengers in case of a flight deviation.
Communiqués liés
2023 : une année de transition et de transformation
Lors de l’Assemblée générale qui s’est tenue le 24 avril 2024, les acti...
Cargolux posts profit for 2023
The Cargolux Group (Cargolux) generated a positive net result for its 2023 finan...
Gcore Recognised as Highly Commended in the Industry Innovat...
Gcore acknowledged for successful launch of first AI speech-to-text solution for...
MOMENTUM 2024 drives sustainable solutions forward
Deloitte’s annual MOMENTUM Conference fosters a dynamic exchange between indus...
Nouvelle recrue au service client de NO-NAIL BOXES : Nadine ...
NO-NAIL BOXES, le fabricant luxembourgeois de caisses pliantes en bois contrepla...
Réseau ETRE est le nouveau lauréat du Degroof Petercam Fou...
Réseau ETRE remporte la sixième édition du Degroof Petercam Foundation Award....
Il n'y a aucun résultat pour votre recherche