Topping-out ceremony for the multi-function warehouse of CFL multimodal The CFL subsidiary equips itself with state-of-the-art logistics infrastructures

fr en de

The topping-out ceremony for the new multi-function warehouse of CFL multimodal was held today at the logistics park Eurohub-South in Dudelange (L), in the presence of Mr. François Bausch, Minister for Durable Development and Infrastructure.

<< Back
08/07/2016 | Inauguration
  • COP 3

    M. François Bausch, Minister for Sustainable Development and Infrastructures

Nine months after breaking ground, CFL Freight celebrated the topping-out ceremony for the new multi-function warehouse of CFL multimodal. Among the guests were Mr François Bausch, Minister for Durable Development and Infrastructure. and Mr Dan Biancalana, Mayor of the city of Dudelange, as well as representatives of the Ministry of Economy and employees from the companies that have been working on this facility since November 2015.

For the construction, the warehouse was divided into three big areas that are being built sequentially. More than 100,000 tonnes of backfill were used. The reinforced concrete structure, with columns of up to 19.3 metres high and beams of up to 34 metres long, was erected within a three month time period. The complete shell construction phase was concluded in five months and interior work started as early as April. The completion of the warehouse, which 100 people have contributed to so far, is on schedule for the end of 2016.

The new warehouse has a 30,000 m2 surface as well as 64 loading docks and is divided into different warehouse zones: high-rack storage, roll storage, block storage, hothouse – up to +75°C, tire storage, picking & packing space, cold storage – up to +5°C, freezer storage – up to -23°C.

The logistics park will be connected to the new intermodal terminal Bettembourg-Dudelange, which will become operational at the end of this year.

By 2025, approximately 200 people will become active for the CFL multimodal Group at the logistics park. „We are investing 34 million € in this state-of-the-art warehouse in order to offer our customers high quality services in the future“, states Fraenz Benoy, Managing Director of CFL multimodal.

Back to top  | << Back

Communiqués liés

Kleos nano-satellite artwork -source Kleos (002)

Kleos Space prend pied aux États-Unis

Accès des ministères du gouvernement américain aux fichiers de données des s...

Kleos Space S.A.
1 Adriano Picinati di Torcello - Deloitte (002)
14/10/2019

Deloitte lance la 6e édition de l’Art & Finance Report

L’art et les objets de collection continuent de susciter l’intérêt dans le...

Deloitte
Flavia Micilotta (002)
14/10/2019

LuxSE releases Guide to ESG Reporting

In line with its stated objective to promote transparent capital markets, the Lu...

Bourse de Luxembourg
Luxempart
14/10/2019

Luxempart co-invests in Boxine alongside its partner Armira

Luxempart, a Luxembourg-based investment holding backed by entrepreneurial famil...

Luxempart
Induction week (002)
11/10/2019 Personnalités

Deloitte Luxembourg accueille plus de 200 nouveaux talents e...

Entre septembre et octobre, plus de 200 nouveaux talents ont rejoint Deloitte L...

Deloitte
JobsEurope

Gagner la «guerre des talents» - JobsEurope Sàrls lance u...

Les experts financiers peuvent désormais trouver leur futur emploi au Luxembour...

JobsEurope Sàrls

Il n'y a aucun résultat pour votre recherche

We use cookies to ensure the best experience on our website. By accepting you agree the use of cookies. OK Learn more